Safety gates

A battery command passes four gates in order. Every gate is a separate switch; none implies another.

flowchart LR
    W["Write access<br/>Inverters page, global"] --> M["Operating mode<br/>Off / Manual / External, per inverter"]
    M --> V["Hardware verification<br/>per-device capabilities"]
    V --> D[Dispatch<br/>clamped, TTL-bound]
    CP[Charging plan preview] -.->|dispatches nothing, bypasses no gate| D

The charging plan bypasses none of these gates because it never dispatches.

Gate Where What it does
Write access Inverters page (global) Allows the service to write to inverters at all. It also opens the generic PUT /api/v1/devices/{id}/metrics routes, so it stays a deliberate, separate switch: choosing a mode never turns it on.
Mode per inverter Energy Manager page Off, Manual or External: who may command this inverter. Selecting Off hands back an active Manager command and verifies the inverter's Internal SoC strategy before disabling Manager control.
Hardware verification Background service Per-device capabilities; an unverified required capability blocks the dispatch mode it guards. See Hardware Verification.
Expert mode Energy Manager page A display switch only: it shows a measured verification override, limits and diagnostics. It changes no behaviour.

Operating modes

Off is the factory and default Energy Manager state; an inverter without a stored mode is Off. While every inverter is Off, Energy Manager forecast refresh (spot market and weather) and charging-plan computation are suspended. Stored configuration and forecast/history data remain intact. Shared forecast refresh remains active while at least one inverter is Manual or External. General inverter telemetry, the transport and the consumption history keep running in every mode.

Who may call what, per mode:

Mode Admin GUI (signed-in session, CSRF, no token) REST API with a read/write token (POST .../energy/command)
Off refused, 409 energy_manager_off refused, 409 energy_manager_off
Manual allowed: charge, keep idle, discharge refused, 409 energy_manager_not_external (an operator must switch the inverter to External)
External refused, 409 energy_manager_external ("Controlled by an external app") allowed
  • In the admin GUI the Charge, Keep idle and Discharge buttons are disabled while the inverter is Off; the backend refuses the same calls with 409 energy_manager_off. The mode selection stays usable.
  • Reading the status (GET .../energy) works in every mode, with a session or a token.
  • The mode can only be changed in the admin GUI (PUT /admin/api/energy/devices/{id}/mode, session and CSRF; a token gets 403). Changing the mode to Off, or between Manual and External, first hands the inverter back to its previous settings, so an operation started under one mode never outlives it.
  • Selecting Off also sets and verifies the inverter's Internal SoC strategy. If that cannot be confirmed, the mode stays Manual or External and the UI reports the error. Internal lets the inverter choose its own charge power; Off does not request maximum charging power.
  • The expert endpoint POST /api/v1/devices/{id}/battery/dispatch is independent of the mode. External is therefore not the only API path to the battery; it is the one for an app that uses the business actions (charge, hold, ...) while the operator keeps the on/off decision.

Switching on

A newly added inverter has no confirmed operating mode. The admin page shows Not yet managed and the observed inverter SOC strategy; it does not label a new inverter on Constant or External as Off or Automatic. The public API cannot change the mode. A command while no mode has been selected answers 409 energy_manager_off.

Selecting Manual or External needs:

  1. Write access on (otherwise 409 energy_write_support_required; the GUI points to the Inverters page).
  2. Power limits.
  3. The hardware-verification gate.

Selecting Manual or External adds the four dispatch register approvals to the write allowlist if missing (never removes any), which also opens them to the generic PUT /api/v1/devices/{id}/metrics. Selecting Off hands control back and verifies Internal strategy before changing the mode; it removes no approval. If the approvals are revoked on the Inverters page, the actions report write_not_permitted and commands answer 409 energy_action_unavailable. A custom write allowlist file must contain power_mng_soc_strategy, power_mng_soc_target_set, power_mng_battery_power_extern and power_mng_use_grid_power_enable.

REST API

Both endpoints need a read/write token and write support, like battery dispatch. A command is accepted only while the inverter is in mode External. The status carries mode (off, manual, external), accepts_commands_from (none, admin, api) and the derived armed flag (true unless the mode is off), kept for compatibility. mode=off on the public API describes command authorization only; it does not prove the inverter's physical strategy. The admin page combines the saved mode with a current strategy reading for that indication.

Method Path Purpose
GET /api/v1/devices/{device_id}/energy State, readings, target window, per-action availability
POST /api/v1/devices/{device_id}/energy/command One action: charge, discharge, hold, auto
curl -X POST -H "Authorization: Bearer $TOKEN" -H "Content-Type: application/json" \
  -d '{"action":"charge","target_soc_percent":80}' \
  http://127.0.0.1:8000/api/v1/devices/main/energy/command
Action target_soc_percent max_power_w Effect
charge required optional Charges until the target SoC is reached
discharge required optional Discharges following the house load until the target SoC; cuts discharge immediately on grid export, bypassing deadband and write interval
hold omit omit Holds the battery at 0 W, grid charging off
auto omit omit Stops the current Manager command and restores the pre-command inverter settings; it does not switch the Manager Off or select the Internal strategy
  • A body that violates the table is rejected with 422 invalid_request.
  • max_power_w defaults to the limit configured for the inverter and is clamped to it (power_limit_clamped: true).
  • The target must lie inside target_soc_window (7 % to 95 %: the product range 7 % to 97 %, narrowed by the fixed dispatch SoC bounds 5 % and 95 %); otherwise 422 value_out_of_range. It is never clamped.
  • A command lives one hour and is not renewed; the status publishes until. A service restart hands every running command back to the inverter.
  • auto replays the captured pre-dispatch registers. If that cannot be confirmed, the answer is 409 dispatch_restore_required; repeating auto is the retry.

Write access toggle

Switching "Write access" on the Inverters page is live (no restart): off refuses writes, sets every device to mode Off and hands the inverters back to automatic operation; on requires choosing a mode again. If a hand-back fails, the response lists write_restore_pending and the automatic restore retry continues.

Status readings

readings carries battery_soc_percent, grid_power_w (positive = import), pv_power_w, house_load_w and battery_power_w, each with age_seconds and stale. They come from the periodic read cache (periodic interval, fixed at 30 s), never from a device read, and are null with stale: true when unavailable. A missing reading never blocks a command.

battery_power_w is measured: positive = discharging, negative = charging. commanded_power_w and commanded_direction are what the last command requested.

An action whose hardware capability is unverified reports available: false with reason hardware_not_verified.

Restore behaviour

  • Every command captures the pre-dispatch registers. auto, a mode change to Off, switching write access off and a service restart hand the inverter back to them.
  • A device stuck in fault_restore_pending (the restore itself failed) is retried automatically by the dispatch cycle. The delay between attempts doubles from 1 s up to 30 s; there is no attempt limit. The Energy Manager admin status carries the failed attempts (restore_attempts) and the next retry time (next_restore_at).
  • While a device is dispatching or not in mode Off, clearing a required register approval is refused (HTTP 409), because the hand-back writes it.

Charge power limits

Grid charging is bounded by a safety clamp that can only ever lower the charge power, never raise it.

effective charge power = min(requested power, configured static device limit, verified live limit)

The static device limit is the verified maximum grid-charge power configured for the device; the inverter and its BMS keep their own internal protection regardless.

The live-limit term is the Live Charge Envelope seam. On this build it is wired but unconditionally inert: the RCT producer always reports "no live limit", so the configured static limit alone governs. A live limit constrains dispatch only once a real per-device hardware verification contract exists for its register; no value is derived or invented, and a missing, stale or unverified limit always falls back to the static bound. Once a verified producer is attached, a live limit older than a conservative freshness bound is ignored too.

Capability gates and evidence

The hardware-specific parts of battery dispatch (the external-control strategy code and the sign conventions for battery power and grid power) are not configured through the environment. They are per-device capabilities, persisted in the dispatch database and set through the admin dispatch API (/admin/api/dispatch/..., not part of the public contract). Current verification status per feature: Hardware Verification.

  • Shipping state is unverified. A fresh database ships every capability as unverified with assumption defaults the adapter works with (for example battery_discharge_positive = true, grid_import_positive = true). An unverified required capability blocks the dispatch mode it guards, for that device only.
  • Verification is per device, not per model. Verifying device A never releases device B, even of the identical model and firmware. The only supported transfer is an explicit capabilities:copy-from call naming the source device and the target model/firmware; it copies only capabilities whose evidence matches, and logs each copied row at WARNING. A firmware update invalidates the capabilities it affects; re-verify after updating.
  • Engineering mode is the only way to dispatch on unverified hardware. It is a per-device switch (PUT /admin/api/dispatch/devices/{device_id}), carries a shorter TTL cap than normal operation, and still refuses the write-path capability without a strategy code, because the write cannot be formed without one.
  • A removed device loses its dispatch state. Removing a device (or re-addressing it under the same id) resets all its capabilities to unverified, switches engineering mode off and sets the Energy Manager mode to Off. The reset runs only after the new device graph was built.
  • A capability or device-limit change is refused while an operation it affects is active. Flipping a sign convention, re-verifying the write path, or changing the power limits or engineering-mode switch of a device with a running dispatch answers 409 dispatch_capability_conflict and names the blocking operation. Stop the operation or let it finish first.

Evidence fields per capability

Each capability row carries only the evidence that governs it. The dispatch adapter reads every evidence field from exactly one capability, so GET .../capabilities reports it on that row only and null on all others. null means "not applicable to this capability", never "unset".

Capability Evidence field
battery_power_sign_convention battery_discharge_positive
grid_power_sign_convention grid_import_positive
write_path_convention soc_strategy_external_code, enum_byte_width, bool_byte_width, write_frame_layout_verified, apply_sequence_verified
export_limit_convention export_limit_zero_blocks_export

note is the exception: every capability may carry one.

  • A PUT that sets an evidence field on a capability that does not govern it is refused with 422 instead of storing a value the adapter would ignore.
  • PUT replaces the capability record; it is not a partial update. An omitted evidence field is reset to its assumption default, so read the capability first and resend the fields to keep.
  • soc_strategy_external_code is returned as the raw register value, since the RCT register catalog carries no enum label table for it (the meaning is device and firmware specific). It is only interpretable together with note, so setting write_path_convention to verified is refused with 400 unless the PUT supplies a non-empty note (hardware model, firmware, what was observed).

Expert hardware verification override (admin API)

The form uses two session-guarded admin endpoints (CSRF header required, not part of the public API):

Method Path Effect
PUT /admin/api/energy/devices/{device_id}/hardware-verification Verifies write_path_convention, battery_power_sign_convention and grid_power_sign_convention in one transaction, all or none
DELETE /admin/api/energy/devices/{device_id}/hardware-verification Revokes the same three; only the status changes, recorded evidence stays

The PUT body needs verified_device_model, verified_firmware, a non-empty note, soc_strategy_external_code (0-255), enum_byte_width and bool_byte_width (1-4), and the booleans write_frame_layout_verified, apply_sequence_verified, battery_discharge_positive and grid_import_positive. Both verification flags must be true, otherwise the answer is 400. A running operation of the device answers 409 dispatch_capability_conflict. Both calls return the admin device status, whose capability rows now also carry the two verification flags.

The note documents the write path only. A note already stored on one of the two sign records is carried over unchanged, because this form has no input field for it. The form covers the write path and both sign conventions only; export_limit_convention cannot be set there and matters only with limit_export_during_discharge, which is off by default.

The application verifies each inverter in the background when the required measurements and safe conditions are available. It retries an inconclusive check without granting an unverified capability. The Expert form is a targeted override with measured evidence, not a step in normal setup. The operator's internal hardware verification plan and filled-in sheets are not part of this site.

Hold status

hold has not been demonstrated on this unit and ships behind the same per-device capability gate as every other mode; see Hardware Verification. A verification run must show roughly 0 W battery power within one control cycle, a setpoint that stays 0 W for the full TTL, a clean auto return, and no grid charging.

Admin GUI

The dashboard shows the full live energy-flow graphic (PV, grid, battery, house). The Energy Manager shows a compact grid, house and battery view beside the controls when space allows. Both use measured, sign-normalized readings. The dashboard refreshes approximately every 10 s; the Energy Manager page polls every 3 s; while write support is off the energy device list answers the expected 503 (logged at DEBUG) and the page polls every 30 s until the next success. An inverter that does not answer is listed by its configured host.

The Energy Manager exposes its operating mode separately from its command state:

  • Mode (Off / Manual / External): who may command the inverter, a three-state radio group in the card header (PUT .../mode). Choosing a mode does not by itself charge or discharge the battery. The charge, keep idle and discharge buttons are enabled in Manual only; in External they are disabled and the card says "This inverter is controlled by an external app through the API (PAT required)." Off is shown as selected only after an explicit Off transition and a fresh readback of Internal strategy; if the strategy later changes or cannot be read, the page marks Off as unconfirmed. With Write access off, a hint links to the Inverters page.

The device card no longer repeats command state or battery SoC as text; the live-flow graphic shows the battery reading and current power flows.

The page is layered by in-page progressive disclosure:

Layer Content
Operate (always shown) Device name and connection, the mode control, the current mode sentence, SoC, the actions Charge battery / Keep battery idle / Discharge battery with a contextual target-SoC slider and a primary button (for example "Charge battery to 80 %"). Normal cache age is not shown; a transient polling failure shows "Live data unavailable."
Setup (only when a prerequisite is missing) A readiness checklist (Inverter connected / Write access / Power limits / Hardware verification). Hardware verification displays background progress or the reason it cannot complete. Power limits are shown in kW.
Expert The page-wide Expert mode switch next to the heading (off on every page load, never stored): measured hardware verification override and Revoke verification, kW power limits, engineering mode and the SoC target policy.
Diagnostics (collapsed, inside Expert) The gate table (the only place raw reject_detail and capability names appear), the capability table, the approved and added write names, per-reading age and staleness, and the poll timestamp.

Details of the Setup checklist:

  • "Write access" is met only when the four required registers (power_mng_soc_strategy, power_mng_soc_target_set, power_mng_battery_power_extern, power_mng_use_grid_power_enable) are approved under Writable parameters on the Inverters page; the global write switch alone is not enough.
  • The first time Write access is switched on, these four registers are approved automatically (add-only, applied once). Clearing one later is respected: a later off/on toggle does not approve it again, the actions answer write_not_permitted, and the checklist step shows it missing.
  • The hardware verification override is Expert-only. Basic mode shows progress and any blocker but never asks for strategy code, byte widths or a verification button. While the Setup block shows the power-limit step, that form sits in the Setup block instead.

The action relabels are presentation-only: the REST action names on the wire are unchanged (charge, discharge, hold, auto). If write support is disabled, the Operate poll answers 503 and the page shows "Manual battery control requires write support to be enabled." instead of the control.

Upgrade note

The dispatch store adds its Energy Manager tables on first start (schema 3) and the operating mode in schema 4. On the first start a stored armed=true becomes mode manual and armed=false becomes off. An older build rejects the migrated database; restore a backup to go back. Back up the dispatch database together with HMAC_SECRET, like data/rct.db.